This technique has an advantage over conventional cable laying methods in that it is much faster to execute. Traditionally, the standard methodology for laying a subsea cable to or from shore would be by either of the following two methods. Identify the designated cable drum for cable pulling and raise the cable drum above the ground level with cable jack to unwind the cables to the pulling direction. Cables are laid at a typical ship speed of 6 knots. Us20160254653a1 bundle of cables, a method of laying. The purpose of this method is to describe the measures and ways of proper installation of low voltage cables and wires in this project.
The methods set forth are not difficult, nor are they technical. While the crosssection varies between 7 and 15 cm, the depth is typically between 30 and 40 cm. In cable trays or cable ducts fixed with clamps usually at walls and ceilings. The fastener is watersoluble, biologically decomposable andor chemically decomposable. For groups of cable d e is the sum of the cable diameters.
The routing line is also used to bridge gaps between different raceway systems where cables simply jump from one raceway to another. The cable on the vessel is wrapped around a modified roller quadrant on the vessel. Open trench cable laying is often used as opposed to laying cables directly into cable ducts. Underground cable distribution up to and including 33kv infrastructure technical standards page b05. There are five different methods of laying cables e. The roller quadrant is moved from the vessel into the water. During this phase, the balloon buoys are attached along the cable to prevent possible damages to the cable. The trench is covered with a layer of fine sand of about 10 cm thickness and the cable is laid over this sand bed. Figure f2 cable feed into conduit at floor level c from cable reel to cable tray, the cable is fed from the top of the reel to maintain required curvature. Once found, they can be easily added to the work sheets. Method statement for laying of low voltage cables and wires. With the introduction of new internet and communications technologies, the need for laying highend, highcapacity internet and other.
Displays when you select the cable routing cable laying methods tab from the options dialog. May 19, 2017 cable tags will be installed on both ends of the cable. Temperature range the temperature range of the cable is of great importance for both the user and fitter. The cable laying methods grid lets you configure the methods for how cable is run in a specific raceway component type such as cable tray, conduit, duct bank etc. All cable shall be securely fixed to the tray, work and the complete installation must be carried out in a neat and workmanlike manner without crossovers. Jan 16, 2015 with the introduction of new internet and communications technologies, the need for laying highend, highcapacity internet and other cables such as fiber fibre optic has stepped up in india. In this method of laying underground cables, a trench of about 15 metres deep and 45 cm wide is dug.
Optical fiber cables are designed with a maximum tensile strength. The 3 main underground cable laying system use in practice. Trefoil formation refers to a method of arranging cables. No wires will be drawn through unless conduit and trunking installations have been completed and inspected and cleaned.
Laying condition type of insulation cable type and design economic aspects. Cable installation manual for power and general cable. The timing of the fid also varies according to the approach and strategy of each offshore wind farm developer. High voltage xlpe cable systems technical user guide. Do n cable than sp allow it to kin can alter the t cable the ca 3. During rare cable laying events, vessels must follow a precise. Ieee guide for the design and installation of cable systems in substations sponsor substations committee of the. Because this cable is nonmetallic, it contains a separate equipment grounding conductor. Connecting the individual cables in the trefoil formation minimizes the. The cable is fed from the bottom of the reel so that its curvature is continuous with no reversed bends. The direct system of cable laying involves the cables laid in a cable trench and after that, the cable is filled with soil.
Overview of the offshore transmission cable installation. There are different methods are used to lay cable in the electrical systems. Pull the cable with cable pulling machine or manually from one feeder end to the other end. These three methods are explained below with their advantages and.
On the basis of surveys, general permission from road and rail authorities for laying the optical fiber cable along the decided routes and permission for rail road crossings will have to be obtained. Accurate and faultless installation and assembly of cables and sleeves. This manual provides installation information for power and control cables for industrial. Mar 14, 2018 open trench cable laying is often used as opposed to laying cables directly into cable ducts. A method of laying at least two underwater cables simultaneously from a vessel and a method of using a watersoluble, biologically decomposable andor chemically decomposable fastener to fasten at least two underwater cables together to form a bundle of cables are also described. The cable should never be loaded beyond its maximum tensile strength.
The timeline will vary from project to project, depending on the specific engineering and financial challenges involved. Cable burial is not an element of cable laying in this region. Cable laying shall be started by rotating the drum in a direction, recommended and marked side of the cable drum and cables are pulled, accordingly. The arrangement of cables, all methods of laying and installation shall be agreed with the engineer, which shall be planned to provide an orderly formation, free from unnecessary bends and crossings, permitting the removal of any one cable without undue disturbance to adjacent cables. The purpose of work procedure for cable pulling generating this method statement is to define the procedure step by step to implement the correct practice for laying the cable from substation to the location of newly assigned area. Ieee std 525 2007 revision of ieee std 5251992incorporates ieee std 5252007cor1. The name of this new group is laying and installation techniques for high voltage cable systems. Appendix 3 typical methods of installation of cables.
The trench also cover with bricks or concrete slab then again fill with soil. Optical submarine cable laying method laying procedure. Method statement for installation of high voltage hv. The reliability of underground cable network highly depends upon proper laying of cables, quality of cable joints and branch connections etc.
Cables or cable supports shall not be fixed directly or indirectly to plant, equipment or process piping which may require removal or replacement. Cable laying techniques cable insulator electricity. The three most common methods of cable placement are direct buried, cable in conduit, and a total conduit system. It can also induce eddy currents in the cable sheath and metallic conduits which can cause heating. Ieee guide for the design and installation of cable. Wiring will only be carried out after the conduit installations and plaster work is completed. Appendix 4 of bs 7671 institution of engineering and.
Where single core pvc insulated wires are enclosed within the conduit and trunking, care will be taken that no damage will occur to the wires during. Weed matts are typically avoided during transits if seen during daylight hours. Bentley raceway and cable management has a default method defined multilayer, but this section lets you define fill. Method statement for installation of cable tray or trunking. Cable passing through fire rated walls will be sealed with fire barriers of approved type. Method statement risk assessment scottish government. Mar 09, 2018 method statement for laying of low voltage cables and wires. The arrangement of cables, all methods of laying and installation shall be agreed with the engineer, which shall be planned to provide an orderly formation, free from unnecessary bends and crossings, permitting the removal of any one cable without undue disturbance to. The cable tray shall be installed with a 40mm minimum space between the structure and the tray. This method is the most popular as it is simple and cheap. The system of cable laid with a serving and its enough to protect the power. It is advisable to have conduits of nonferrous metals. Cable laying method in the ground when placing a routing line using the raceway router, the in the ground cable laying method should be selected. Towards the cable landing station a, one end of the cable is paid out by the cable ship and landed.
Method statement for installation of high voltage hv cables. There are so many parameters to consider while the laying of. Chapter methods and materials mike holt enterprises. Most utilities are currently using one or more of these methods with various degrees of success. All installed cables to be sealed at both ends by proper end caps shrouded to avoid dirt, debris and water accumulation. Nonmetallicsheathed cable is a common wiring method used for residential and commercial branch circuits.
The first system or method commonly undertaken is the direct. Tension during laying of the cable particular attention must be paid to the maximum possible tension. Direct in the ground in trenches underground cables. Cable laying techniques free download as powerpoint presentation. Works shall be carried out in compliance with the drawings, project specifications, and materials. There are three main methods of laying underground cables, which are i direct laying, ii drawin system and iii solid system. Appendix 4 of bs 7671 bs 7671 home of the wiring regulations. The sand prevents the entry of moisture from the ground and. F or purpose of deciding the depth at which the cable is to be laid a rocky. The cables to be laid using this method must have the serving of bituminised paper and hessian tape so as to provide protection against corrosion and electrolysis.
Look out for heating tubes, which are not heated all the time. They are logical ideas that have been arranged and put into a simple system. Us20160254653a1 bundle of cables, a method of laying cables. The crosssection and depth of the trench will depend on the number of ducts to be laid.
Bentley raceway and cable management has a default method defined multilayer, but this section lets you define fill methods for. The three most common methods of cable placement are direct buried, cable. A bundle of cables includes at least two underwater cables and a fastener for fastening the underwater cables together. Scope of this method statement covers the following activities. Exact minimum bending radii for specific cables can be found in the information sheets of the cable manufacturer. This method of laying underground cables is simple and cheap and is much favoured in modern practice. Underground installation of optic fiber cable placing. A pulling device is attached by a line to the roller quadrant. Installation of power cables under tracks and elsewhere on railway. Cables shall be laid on racks or trays strictly in accordance with the laying patterns stated on the layout drawings. Overview of the offshore transmission cable installation process in the uk 7 investment decision fid. Insulation resistance of hv cable should be checked by using 5 kv megger after installation and before termination of cables and readings shall be submitted to the consultant. Other methods of installation are recognised but are, essentially, variations of other methods and are therefore allocated appropriate reference methods, shown in table 2 overleaf. If the route contains sections where the optical cable is subject to high temperatures the necessary protection should be provided.
Electrical installations of ships and of mobile and fixed offshore units. Main changes with respect to the second edition relate to. Coexisting underground utilities if the cable route comes across or is between coexisting underground utilities like sewer line, open drain, canal, bridge and other utility cable trench, the cable. A method for laying cable from a vessel at a near shore location in shallow water to shore. Ieee guide for the design and installation of cable systems. Normally in the electrical system, most of the high voltage cables are laid under the ground. The layout of this cable laying systems can show in the figure. This third edition cancels and replaces the second edition published in 1997, of which it constitutes a technical revision. Cable preparation and pulling procedure best practices for. High voltage xlpe cable systems techincal user guide brugg cables page 2. Cables on faceup horizontally fixed tray must be secured by use of the tie wraps where not in. The invention is generally related to laying cable from a vessel and more particularly to laying cable to or from shore.
It is worth noting that the 17th edition now references cables buried in the ground installation methods 70 to 73. This method of laying cables into the ground tends to be used where the cables in use are of a higher voltage mv hv cables and therefore have a greater outside cable diameter. During final bending the cable can, therefore, be bent more tightly. Protection of the environment during the works laying the 710mm pipe in craigendoran. Buried cable installation practices prysmian group. A method of laying at least two underwater cables simultaneously from a vessel and a method of using a watersoluble, biologically decomposable andor. A guideline for laying of cables and installation of sleeves. Typical cable laying details for direct buried, low. The pulling device is used to pull the roller quadrant and cable toward shore.